STADIUM DEMOLITION

CRANE SETUP FOR STRUCTURE B1

WEST HILL MASS EXCAVATION

CC1 SANITARY SEWER MANHOLE

CC1 SANITARY SEWER MANHOLE

DEMOED CATWALK

EXCAVATION FOR FUTURE BOX CULVERT

PIPE FROM LINE AA6 TO CC1

WORK COMPLETED

 

Demolition
  • Demo catwalk structure, and proceeded to sort and haul off material.
Mass Excavation of West Hill
  • Continue to break rock and haul off.
Water Utilities
  • Video record line AA.
  • Complete Sewer Connections at Manhole EX9 and AA6.
  • Start setting from AA6 to CC line.
  • Set Structure B1 and set line from EX1 to B1.
  • Start setting 72" reinforced cast pipe from B1 to B2. Start mass excavation for box culvert.
Temp Chiller
  • Prepare area for temp chiller and set temp chiller.